plumbing
REVIEW PLUMBING GUIDE
Before you begin, review the plumbing requirements below:
- Water inlet is 1.5″ PVC socket
- Power inlet is 1.5″ conduit socket
- Water depth must be between 2″-12″
- Beach entry slope must not exceed 1/12 grade to keep plume perpendicular with water surface
POST & LEVEL THE UNIT
First, post and level the bubbler unit.
INSTALL PLUMBING
Install the plumbing using PVC glue.
Make sure screws are tight.
- Pressure test all pipe fittings according to your local building codes
- Bubbler is shipped ready to pressure test
INSTALL CONDUIT
Next, install the conduit.
A minimum of one (1) 1.5″ × 90° sweep is required.
After this, you can use a 1″ conduit to the junction box.